No CIL funds have been received from district councils during the reporting period.
As part of the planning process, those applying can be asked to contribute funding towards providing facilities or infrastructure to support the development and the local area.
This is done as part of either the Community Infrastructure Levy or Section 106 agreements.
The Community Infrastructure Levy (CIL)
This is a levy that district councils can charge on new developments to be spent on supporting development with infrastructure that we, the local community and neighbourhoods in the area want.
We are not a charging authority for CIL so will only report if we receive funds under this scheme from district councils.
Section 106 Agreements
Section 106 agreements are focused on site-specific mitigation of the impact of development to make the application acceptable in planning terms.
This means that we will enter into a Section 106 agreement with a developer to provide such things as additional school places or alterations to roads. This can be in the form of a financial contribution or the works themselves.
Annual Infrastructure Funding Statement April 2022 - March 2023
The North Yorkshire Annual Infrastructure Funding Statement 2022-23 (pdf / 722 KB) was approved by Executive on 6 February 2024.
The 2022-23 Infrastructure Funding Statement details the income and expenditure relating to the Community Infrastructure Levy and Section 106 (S106) agreements for 2022/23. It covers the year before North Yorkshire Council was formed and therefore the data is split into the former districts of Craven, Hambleton, Harrogate, Richmondshire, Ryedale, Selby and Scarborough. It also details the contributions received by the former North Yorkshire County Council.
Annual Infrastructure Funding Statement April 2021 - March 2022
Infrastructure list
We are not in receipt of any CIL funds. When we are in receipt of CIL funds we will publish here what infrastructure those CIL receipts have been passed to us for.
CIL report
Section 106 report
Date of S106 Agreement |
Planning Application Reference |
Site |
Contribution |
Non financial contribution |
Purpose |
Received |
---|---|---|---|---|---|---|
22-02-2022 |
21/03683/REMMAJ |
Boroughbridge CP |
£543,500.10 |
|
Education facilities |
No |
12-08-2021 |
20/01556/FULMAJ |
Harrogate |
£236,490.00 |
|
Primary education facilities within the locality served by the development |
No |
Harrogate |
£255,539.83 |
|
Secondary education facilities within the locality served by the development |
No |
||
19-08-2021 |
2020/0776/FULM |
Selby Abbey CE |
£ 92,339.25 |
|
Education facilities |
No |
22-12-2021 |
21/00331/HYB |
Dalton, Land at Eldmire Lane, Dalton [Part OS Field 6717] |
£45,000.00 |
|
Signage Contribution - provisional of additional road signage and/or such improvements to weight restriction signage in Asenby and provision of signing on the A168 northbound advising of appropriate routes |
No |
£5,000.00 |
|
Travel Plan Monitoring Fee |
No |
|||
£550,000.00 |
|
Bus Service Contribution |
No |
|||
27-08-2021 |
20/01223/73M |
Scagglethorpe, Manor Farm, Main Street |
£4,500.00 |
|
TRO Contribution - no waiting restrictions |
No |
01/03/2022 |
21/0238/EIAMAJ |
Allerton Park Land comprising field at 440633 457078 |
|
|
|
No |
22/04/2021 |
NY/2019/0091/ENV |
Knottingley Gale Common Ash Disposal, Cobcroft Lane |
£100,000.00 |
|
Localised highway improvement works- road widening on Cobcroft Lane and Whitefield Lane and bend improvements at Whitefield Lane to the west of Whitley Village |
No |
£108,000.00 |
|
Traffic Signal - SIGNALISED CROSSING COMMUTED SUM - ON THE A19 IN THE VICINITY OF WHITLEY AND EGGBOROUGH CP SCHOOL |
No |
|||
£10,000.00 |
|
Public Rights of Way |
No |
|||
£100,000.00 |
|
Whitley Highway Saftey Contribution a] provision of a community speed camera initiative b] the signallised crossing and c] additional signage or traffic calming measures |
No |
Funds received in reporting year
Year payment received |
Planning Application Reference |
School / area / road named in S106 agreement |
Value of payment |
The purpose of payment |
Amount as per signed S106/CIL agreement |
Already received previously |
The amount of the payment that has been spent |
The amount that has been committed but not spent |
The amount that has not been committed or spent |
|
---|---|---|---|---|---|---|---|---|---|---|
2021/22 |
18/01528/FULMAJ |
Birstwith CE |
£13,596.00 |
Education provision / Scheme to be determined |
£13,596.00 |
|
|
|
£13,596.00 |
|
2021/22 |
17/04259/FULMAJ |
Dishforth CE |
£67,980.00 |
Education provision / Scheme to be determined |
£67,980.00 |
|
|
|
£67,980.00 |
|
2021/22 |
18/01532/FULMAJ |
Green Hammerton CE |
£37,389.00 |
Education provision / Scheme to be determined |
£74,778.00 |
£18,694.50 |
|
|
£56083.50 |
|
2021/22 |
17/01597/OUTMAJ |
Hampsthwaite CE |
£77,044.00 |
Education provision / Scheme to be determined |
£115,566.00 |
£38,522.00 |
|
|
£115,566.00 |
|
2021/22 |
14/00128/OUTMAJ / 16/02574/REMMAJ |
Harrogate High School |
£107,282.32 |
Education provision / Scheme to be determined |
£160,923.49 |
|
|
|
£107,282.32
|
|
2021/22 |
18/02925/FULMAJ |
Harrogate High School |
£21,105.76 |
Education provision / Scheme to be determined |
£21,105.76 |
|
|
|
£21,105.76 |
|
2021/22 |
16/00545/OUTMAJ 18/01603/REMMAJ |
Killinghall CE |
£248,128.00 |
Education provision / Scheme to be determined |
£248,128.00 |
|
|
|
£248,128.00 |
|
2021/22 |
13/00535/EIAMAJ (17/05491/REMMAJ) |
King James' |
£316,570.80 |
Education provision / Scheme to be determined |
£1,582,854.00 |
|
|
|
£316,570.80 |
|
2021/22 |
13/00535/EIAMAJ (17/05491/REMMAJ) |
Manse Farm (New School) |
£200,240.00 |
New School |
£2,002,400.00 |
|
|
|
£200,240.00 |
|
2021/22 |
17/05595/OUTMAJ / 19/02342/REMMAJ |
Pannal CP |
£147,290.00 |
Education provision / Scheme to be determined |
£441,870.00 |
|
|
|
£147,290.00 |
|
2021/22 |
15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) |
Rossett Acre Primary |
£ 139,359.00
|
Education provision / Scheme to be determined |
£278,718.00 |
£139,359.00 |
|
|
£278,718.00 |
|
2021/22 |
18/02960/FULMAJ |
Rossett Acre Primary |
£13,596.00 |
Education provision / Scheme to be determined |
£13,596.00 |
|
|
|
£13,596.00 |
|
2021/22 |
15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) |
Rossett School |
£108,161.70 |
Education provision / Scheme to be determined |
£216,323.38 |
£108,161.68 |
|
|
£216,323.38 |
|
2021/22 |
17/05595/OUTMAJ |
Rossett School and/or Harrogate Grammar School |
£114,317.23 |
Education provision / Scheme to be determined |
£342,951.70 |
|
|
|
£114,317.23 |
|
2021/22 |
19/01734/FULMAJ |
Tockwith CE |
£72,512.00
|
Education provision / Scheme to be determined |
£217,536.00 |
|
|
|
£72,512.00 |
|
2021/22 |
15/01999/EIAMAJ |
Western Primary or New School |
£121,321.00 |
Education provision / Scheme to be determined |
£363,963.00 |
£242,642.00 |
|
|
£363,963.00 |
|
2021/22 |
14/00259/OUTMAJ |
Western Primary |
£377,289.00 |
Education provision / Scheme to be determined |
£377,289.00 |
|
|
|
£377,289.00 |
|
2021/22 |
2015/0712/OUT 2017/1356/REMM |
Brayton CE and/or St Mary's Catholic |
£74,778.00 |
Education provision / Scheme to be determined |
£149,556.00 |
£74,778.00 |
|
|
£149,556.00 |
|
2021/22 |
2015/0105/OUT (2017/0117/REMM) |
Hambleton CE |
£46,906.20 |
Education provision / Scheme to be determined |
£156,354.00 |
£62,541.60 |
|
|
£109,407.80 |
|
2021/22 |
2015/0105/OUT |
Selby High School |
£83,891.26 |
Education provision / Scheme to be determined |
£279,637.54 |
£111,855.02 |
|
|
£195,746.28 |
|
|
11/01914/OL |
Middle Deepdale, Eastfield |
£16,420.00 |
Contribution from Keepmoat Homes for ped crossing on Stepney Rd. |
£16,420.00 |
|
|
|
£16,420.00 |
|
|
18/01923/OUTMAJ |
Burley Bank Road |
£10,000.00 |
Collison Reduction Contribution - A59 Skipton Road/Burley Bank Road priority junction |
£10,000.00 |
|
|
|
£10,000.00 |
|
|
16/00582/OUTMAJ |
Crofter's Green, Ripon Road |
£26,000.00 |
Highway contribution - signallisation of the junction of Ripon Road and Otley Road, Killinghall |
£ 26,000.00 |
|
|
|
£26,000.00 |
|
|
15/04168/FULMAJ |
Whitcliffe Lane, Ripon Cathedral Choir School |
£5,000 |
Travel Monitoring Fee |
£5,000 |
|
|
|
£5,000 |
|
|
14/00259/OUTMAJ |
Land at Harlow Grange, Crag Lane |
£5,000 |
Travel Monitoring Fee |
£5,000 |
|
|
|
£5,000 |
|
|
2014/1129/OUT and 2014/1130/OUT |
Station Road |
£5,000 |
Travel Monitoring Fee |
£5,000 |
|
|
|
£5,000 |
|
|
14/03849/OUTMAJ |
Orchard Close |
£5,000 |
Travel Monitoring Fee |
£5,000 |
|
|
|
£5,000 |
|
|
20/01223/73M |
Scagglethorpe, Main Street |
£4,500.00 |
TRO Contribution |
£4,500.00 |
|
|
|
£4,500.00 |
|
|
18/01923/OUTMAJ |
Burley Bank Road Killinghall |
£5,000.00 |
TRO Contribution |
£5,000.00 |
|
|
|
£5,000.00 |
|
|
15/05478/OUTMAJ |
St Georges Walk, BT training Centre |
£10,000.00 |
Cycle Path Contribution |
£10,000.00 |
|
|
|
£10,000.00 |
|
|
17/01446/OUTMAJ |
New Lane Green Hammerton |
£25,000.00 |
Cycle Path Contribution |
£25,000.00 |
|
|
|
£25,000.00 |
|
|
16/00582/OUTMAJ |
Crofter's Green, Ripon Road Killinghall |
£30,000.00 |
Cycle Link Contribution - widening of footway between Crofters Green and Knox Mill Lane to provide a shared footway/Cycleway facility |
£30,000.00 |
|
|
|
£30,000.00 |
|
£10,000.00 |
PROW CONTRIBUTION - improvements including the provision of gates and/or stiles to public rights of way in the vicinity of the site namely footpath 15.65/6/1 and 15.65/5/1 |
£10,000.00 |
|
|
|
£10,000.00 |
||||
£5,000 |
Travel Monitoring Fee |
£5,000 |
|
|
|
£5,000 |
||||
£26,000.00 |
Highway contribution - signallisation of the junction of Ripon Road and Otley Road, Killinghall |
£26,000.00 |
|
|
|
£26,000.00 |
Annual Infrastructure Funding Statement April 2020 - March 2021
Infrastructure list
We are not a CIL Charging Authority. There are four CIL charging authorities within the county council area:
We are not in receipt of any CIL funds. When we are in receipt of CIL funds we will publish here what infrastructure those CIL receipts have been passed to us for.
CIL report
No CIL funds have been received from district councils during the reporting period.
Section 106 report
Date of S106 Agreement | Planning Application Reference | Site | Contribution | Non Financial Contribution | Purpose | Received | |
---|---|---|---|---|---|---|---|
2 February 2021 | 2019/20076/FUL | Primary education facilities in Skipton | £139,359.00 |
Primary education facilities in Skipton |
No | ||
12 January 2021 |
18/04288/OUTMAJ |
Pannal Primary |
£163,152.00 |
Pannal Primary | No | ||
22 December 2020 | 19/03854/FULMAJ | Burton Leonard CE Primary | £98,571.00 | Burton Leonard CE Primary | No | ||
28 April 2020 | 18/04657/FULMAJ | Sharow CE and / or other local primary schools | £197,142.00 | Sharow CE and /or other local primary schools | No | ||
13 October 2020 | 19/01734/FULMAJ | Tockwith CE | £217,536.00 | Tockwith CE | No | ||
2 December 2020 | 18/04504/OUTMAJ | Holy Trinity Infant & Junior | £71,865.00 | Holy Trinity Infant & Junior | No | ||
3 September 2020 | 19/01237/FL | Newby & Scalby or successor | £513,249.00 | Newby & Scalby or successor | No | ||
3 September 2020 | 19/01248/OL | Newby & Scalby or successor | £747,780.00 | Newby & Scalby or successor | No | ||
21 May 2020 | 18/05001/FULMAJ | Land at Skelton Road |
£6,300 |
Public Transport Contribution |
No | ||
21 May 2020 | 18/05001/FULMAJ | Land at Skelton Road | £25,000 | Cycling and Pedestrian Contribution | No | ||
21 May 2020 | 18/05001/FULMAJ |
|
£5,000 | Travel Plan Contribution | No | ||
13 May 2020 | 18/00123/EIAMAJ | Land adjacent to the A1 [M] between junction 48 and 49 | £2,500 | Travel Plan Contribution | Yes | ||
21 May 2020 | 19/05209/FULMAJ | Land to the north east of Manse Farm |
£3,000 |
Highway Contribution |
Yes | ||
21 May 2020 | 19/05209/FULMAJ |
|
£5,000 | Travel Plan Contribution | Yes | ||
17 December 2020 | 19/02262/02/OUTMAJ | Land at north of Kingsley Farm, Kingsley Road |
£5,000 |
Travel Plan Contribution |
No | ||
17 December 2020 | 19/02262/02/OUTMAJ |
|
£44,628.04 | Traffic Signals Commuted Sum - maintenance and repair to traffic signals and associated infrastructure [creating the third signalised leg] at the site access junction with Kingsley Road | No | ||
17 December 2020 | 19/02262/02/OUTMAJ |
|
£83,746 | Permeable Paving Commuted Sum | No | ||
17 December 2020 | 19/02262/02/OUTMAJ |
|
£3,000 | TRO [Bogs Lane Railway Bridge] Contribution. Works associated with the site access requiring the traffic regulation order to extend the existing 7.5T HGV environmental weight limit at Bogs Lane Railway Bridge | No | ||
26 June 2020 | 18/04183/FULMAJ | Land at Otley Road | £5,000 | Travel Plan Contribution | No | ||
17 July 2020 |
2019/0325/FULMAJ
Section 38 |
Land at Brownfield Site 2, Leeds East Airport, Busk Lane |
£80,000 |
Offsite footway contribution |
No |
Funds received in reporting year
Year payment received | Planning application reference | School / area / road named in S106 Agreement | Value of payment | Purpose of payment | Amount as per signed S106 / CIL agreement | Already received previously | The amount of payment that has been spent | The amount that has been committed but not spent | The amount that has not been committed or spent |
---|---|---|---|---|---|---|---|---|---|
2020/21 | 18/01532/FULMAJ | Green Hammerton CE Primary | £18,694.50 | Scheme to be determined | £74,778.00 | £18,694.50 | |||
2020/21 | 17/01597/OUTMAJ | Hampsthwaite CE Primary | £38,522.00 | Additional accommodation | £115,566.00 | £38,522.00 | £38,522.00 | ||
2020/21 | 18/04687/FULMAJ | Holy Trinity I & J | £18,694.50 | Scheme to be determined | £302,511.00 | £18,694.50 | |||
2020/21 | 16/05603/FULMAJ (18/00187/DISCON) | Holy Trinity I & J | £52,441.71 | Scheme to be determined | £69,922.28 | £17,480.57 | £52,441.71 | ||
2020/21 | 17/01350/OUTMAJ | Manse Farm New School and / or Meadowside Academy | £103,776.33 | Towards a New School to serve the Manse Farm Development | £407,880.00 | £103,776.33 | |||
2020/21 | 15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) | Rossett Acre Primary | £69,679.50 | Scheme to be determined | £278,718.00 | £69,679.50 | £69,679.50 | ||
2020/21 | 15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) | Rossett School | £54,080.84 | Additional accommodation | £216,323.38 | £54,080.84 | £54,080.84 | ||
2020/21 |
15/01999/EIAMAJ |
Western Primary and / or New School | £242,642.00 | Scheme to be determined | £363,963.00 | £242,642.00 | |||
2020/21 |
14/02737/EIAMAJ |
Western Primary / Saltergate / New School | £203,940.00 | Scheme to be determined | £2,039,400.00 | £203,940.00 | |||
2020/21 |
15/01632/FL |
East Ayton CP | £125,630.00 | Scheme to be determined | £159,753.00 | £60,599.64 | £125,630.00 | ||
2020/21 | 16/04981/OUTMAJ | Dishforth CE | £33,990.00 | Additional accommodation | £135,960.00 | £101,970.00 | £33,990.00 | ||
2020/21 | 16/01240/FULMAJ |
Killinghall CE |
£112,167.00 | Additional accommodation | £112,167.00 | £112,167.00 | |||
2020/21 |
15/01691/FULMAJ / 17/04906/DVCMAJ |
Meadowside Academy | £124,063.50 | Scheme to be determined | £248,127.00 | £124,063.50 | £124,063.50 | ||
2020/21 |
15/01484/FULMAJ |
Tockwith CE | £74,778.00 | Additional accommodation - scheme to be determined | £224,334.00 | £149,556.00 | £74,778.00 | ||
2020/21 |
10/02373/OUT |
Keeble Gateway Primary Academy | £650,000.00 | New School - Keeble Academy | £2,446,679.25 | £1,796,679.25 | £650,000.00 | ||
2020/21 |
2015/0712/OUT 2017/1356/REMM |
Brayton CE and / or St Mary's Catholic | £74,778.00 | Scheme to be determined | £149,556.00 | £74,778.00 | £74,778.00 | ||
2020/21 |
2012/0399/EIA & 2012/0400/EIA / 2014/1091/REM |
Sherburn Athelstan CP | £339,900.00 | Additional accommodation | £2,009,400.00 | £1,669,500.00 | £339,900.00 | ||
2020/21 |
18/00123/EIAMAJ |
Land adjacent to the A1 [M] between junction 48 and 49 | £2,500 | Travel Plan Contribution | £2,500 | £2,500 | |||
2020/21 |
19/05209/FULMAJ S278 Agreement |
Land to the north east of Manse Farm |
£7,500 | Highway Contribution and Travel Plan Contribution | £7,500 | £7,500 | |||
2020/21 |
NY/2013/0128/ENV |
Kellingley Colliery | £158,888.88 | Various ecological, landscape and pedestrianisation improvements | £158,888.88 | £158,888.88 |
Annual Infrastructure Funding Statement April 2019 - March 2020
Infrastructure list
We are not a CIL Charging Authority. There are four CIL charging authorities within the county council area:
We are not in receipt of any CIL funds. When we are in receipt of CIL funds we will publish here what infrastructure those CIL receipts have been passed to us for.
CIL report
No CIL funds have been received from district councils during the reporting period.
Section 106 report
Date of S106 Agreement | Planning Application Reference | Site | Contribution | Non Financial Contribution | Purpose | Received |
---|---|---|---|---|---|---|
18 June 2019 | 18/02118/OUTMAJ / 19/04375/REMMAJ | £155,566.00 |
For the purpose of providing additional educational facilities at Goldsborough Church of England Primary School and/or such other primary school within the locality served by the Development the need for which only arises as a result of the Development. |
No | ||
29 October 2019 |
63/2012/13167 |
£ 231,132.00 |
Education facilities at Greatwood and/or provision of new school within locality site | No | ||
30 July 2019 | 19/00768/OL | £169,950.00 | Education Facilities | No | ||
11 June 2019 | 18/01532/FULMAJ | £74,778.00 | Education Facilities | No | ||
10 February 2020 | 18/00710/FULL | £220,935.00 | Education Facilities | No | ||
18 June 2019 | 18/04749/FULMAJ | £183,546.00 | Education Facilities for Key Stage 2 | No | ||
7 June 2019 | 19/00109/FL | £166,551.00 | Education Facilities | No | ||
11 July 2019 | 18/02960/FULMAJ | £13,596.00 | Education facilities for Rossett Acre and / or other primary schools serving the area | No | ||
9 April 2019 | 17/00710/OUT | £197,142.00 | Education Contribution" means the sum of £197,142 to be paid to the County Council and to be used by it towards capital expenditure to enable the provision of additional school places at St Mary's Church of England Primary School, Bolton on Swale and/or towards a new school serving the locality within which the Development is situated PROVIDED THAT if the total number of dwellings to be constructed pursuant of the Planning Permission is fewer than 58 the amount of the education contribution will be recalculated in accordance with the following formula:- 1) the number of dwellings divided by four to give the number of primary school places created by the Development (A) 2. the contribution per primary school place is £13,596 (B) 3. the education contribution is AxB | No | ||
11 November 2019 | 18/04528/FULMAJ | £122,364.00 | To be used by the County Council for the provision of additional education facilities at Tockwith Church of England Primary School. | No | ||
9 April 2019 | 17/00710/OUT | Land to the West of Scorton | Associated Highways Works | No | ||
24/12/2019 | 18/01053/FL | Land adjoining Church Lane | No | |||
10/04/2019 | 2017/18237/OUT | Hawbank Field | £15,000.00 | No | ||
22/05/2019 | 17/01350/OUTMAJ | Land off Boroughbridge Road |
£50,000.00 £5,000.00 £8,000.00 |
Traffic Scheme Contribution - complementary measures associated with the Traffic and air quality scheme Travel Plan Monitoring Fee TRO Contributions - extend the 30mph speed limit on Boroughbridge Road and implementing such order if confirmed |
No | |
28/11/2019 | 17/01897/OUTMAJ | Harrogate Road |
£5,000.00 £5,000.00 |
Travel Plan Monitoring Fee TRO Contribution - Extend the 30mph Speed limit on Harrogate Road |
No |
|
20/05/2019 | 17/02937/FULMAJ | Land at Aldborough Gate |
£5,000.00 £5,000.00 |
Travel Plan Monitoring Contribution TRO Contribution - relocate speed limit on Chapel Hill |
No | |
11/06/2019 | 18/01532/FULMAJ | Yule Lane/ New Lane |
£100.00 (per dwelling) £25,000.00 £5,000.00 |
Public Transport Contribution [sum per dwelling] Cycle/Pedestrian Infrastructure Contribution Travel Plan Monitoring Fee |
No | |
05/06/2019 | 18/01557/FULMAJ | Land comprising OS Field No 6952, Harrogate Road |
£12,000.00 |
Vehicle Activated Sign - Solar powered electronic traffic signs to monitor speed of traffic on the A6055 Harrogate Road |
Yes | |
05/06/2019 | 2015/0712/OUT | The Poplars | Associated Highways Works | |||
04/04/2019 | Drax Power Station | £388,750.00 | Landscape mitigation projects |
Funds received in reporting year
Year payment received | Planning application reference | School named in S106 Agreement | Value of payment | Purpose of payment | The amount of payment that has been spent | The amount that has been committed but not spent | The amount that has not been committed or spent |
---|---|---|---|---|---|---|---|
2019/20 | 10/02373/OUT | Keeble Gateway Primary Academy | £650,000.00 | To provide additional educational facilities. | £650,000.00 | ||
2019/20 | 16/04981/OUTMAJ | Dishforth CE | £101,970.00 | To provide additional educational facilities. | £101,970.00 | ||
2019/20 | 14/03119/FULMAJ | Harrogate High and/or Harrogate Grammar and/or Rossett School | £448,475.00 | To provide additional educational facilities. | £376,000.00 | £72,475.00 | |
2019/20 | 16/05603/FULMAJ (18/00187/DISCON) | Holy Trinity Junior | £52,441.71 | To provide additional educational facilities. | £52,441.71 | ||
2019/20 | 15/01691/FULMAJ | Meadowside Academy | £62,031.75 | To provide additional educational facilities. | £62,031.75 | ||
2019/20 | 14/03119/FULMAJ | New Park Primary | £577,830.00 | To provide additional educational facilities. | £577,830.00 | ||
2019/20 | 13/02358/OUTMAJ (17/02123/REMMAJ) | Pannal CP | £125,000.00 | To provide additional educational facilities. | £125,000.00 | ||
2019/20 |
15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) |
Rossett Acre Primary | £66,679.50 | To provide additional educational facilities. | £69,679.50 | ||
2019/20 |
15/05478/OUTMAJ (17/05030/DVCMAJ) (18/00821/REMMAJ) |
Rossett School | £54,080.84 | To provide additional educational facilities. | £54,080.84 | ||
2019/20 |
15/01484/FULMAJ |
Tockwith Primary Academy | £74,778.00 | To provide additional educational facilities. | £74,778.00 | ||
2019/20 | 15/01999/EIAMAJ | Western CP or New School | £121,321.00 | To provide additional educational facilities. | £121,321.00 | ||
2019/20 | 14/02737/EIAMAJ |
Western CP/ Saltergate/ New School |
£203,940.00 | To provide additional educational facilities. | £203,940.00 | ||
2019/20 |
16/00139/FULL |
Colburn CP | £311,941.04 | To provide additional educational facilities. | £311,941.04 | ||
2019/20 |
14/01362/FL |
Lindhead Primary | £45,107.00 | To provide additional educational facilities. | £45,107.00 | ||
2019/20 |
2015/0586/OUT 2018/0468/REM |
Barlby CP | £125,763.00 | To provide additional educational facilities. | £125,763.00 | ||
2019/20 |
2015/0712/OUT 2017/1356/REMM |
Brayton CE or St Mary's Catholic | £74,778 | To provide additional educational facilities. | £74,778.00 | ||
2019/20 |
2012/1103/FUL 2015/0318/FUL (2016/1382/FUL) |
Kirk Fenton CE | £132,561.00 | To provide additional educational facilities. | £132,561.00 | ||
2019/20 |
2015/0105/OUT |
Selby High School | £111,855.02 | To provide additional educational facilities. | £111,855.02 | ||
2019/20 |
2012/0399/EIA & 2012/0400/EIA / 2014/1091/REM |
Sherburn Athelstan CP | £509,837.50 | To provide additional educational facilities. | £509,837.50 | ||
2019/20 |
2015/0356/OUT |
Whitley and Eggborough CP | £13,596.00 | To provide additional educational facilities. | £13,596.00 | ||
2019/20 |
18/01557/FULMAJ |
Ferrensby | £12,000.00 |
Vehicle Activated Sign - Solar powered electronic traffic signs to monitor speed of traffic on the A6055 Harrogate Road |
£12,000.00 |